Document Type
Technical Report
Publication Date
9-1-2003
Keywords
water quality sampling, pollutant loads, Arkansas, Illinois River
Abstract
Automatic water samplers and a U. S. Geological Survey gauging station were established in 1995 on the main stem of the Illinois River at the Arkansas Highway 59 Bridge. Since that time, continuous stage and discharge measurements and water quality sampling have been used to determine pollutant concentrations and loads in the Arkansas portion of the Illinois River. This report represents the results from the measurement and sampling by the Arkansas Water Resources Center -Water Quality Lab for January 1, 2002 to December 31, 2002.
Citation
Nelson, Marc A. and Cash, Wade. 2003. Illinois River 2002 Pollutant Loads at Arkansas Highway 59 Bridge. Arkansas Water Resources Center, Fayetteville, AR. MSC308. 14
https://scholarworks.uark.edu/awrctr/112
Report Number
MSC308
Page
14