Document Type
Technical Report
Publication Date
10-1-2001
Keywords
automatic water sampling, pollutant concentrations, water quality
Abstract
Automatic water samplers and a U. S. Geological Survey gauging station were established in 1995 on the main stem of the Illinois River at the Arkansas Highway 59 Bridge. Since that time, continuous stage and discharge measurements and water quality sampling have been used to determine pollutant concentrations and loads in the Arkansas portion of the Illinois River. This report represents the results from the measurement and sampling for January 1, 2000 to December 31, 2000
Citation
Nelson, Marc A. and Soerens, Thomas S.. 2001. Illinois River 2000 Pollutant Loads at Arkansas 59 Bridge. Arkansas Water Resources Center, Fayetteville, AR. MSC298. 11
https://scholarworks.uark.edu/awrctr/118
Report Number
MSC298
Page
11